Railway (RRB) /Mathematics

Time & Work

Time & Work · free study notes

Time & Work – Advanced Study Notes

(Designed for RRB Railway Mathematics – “Time & Work”)


1. Introduction

The Time & Work problem is a staple in Indian competitive exams. It tests a candidate’s ability to model real‑world processes with algebraic equations, particularly when multiple agents (people, machines, trains, etc.) perform the same job together or separately.

We will:

  1. Derive the fundamental formula from first principles.
  2. Discuss key variations (work rates, fractional work, multiple agents).
  3. Examine edge‑cases and pitfalls.
  4. Present a rigorous proof of the Time & Work theorem.
  5. Offer a challenging problem with a detailed solution.

2. First‑Principles Derivation

2.1 Work as a Continuous Quantity

Let a job be quantified by a real number (W > 0) (e.g., “units of work”).
For any worker (i) we define a work‑rate (r_i) (units of work per unit time).
Assuming the rate is constant over the period of interest (i.e., no fatigue, no improvement, no downtime), the work done by worker (i) in time (t) is simply

[ W_i(t) = r_i , t. ]

2.2 Collective Work

If (n) workers act simultaneously, the total work rate is

[ R = \sum_{i=1}^{n} r_i. ]

Hence the time to finish the job is

[ T = \frac{W}{R}. ]

This is the Time & Work theorem.


3. Variations & Generalizations

Scenario Formula Notes
Two workers, same job (T = \dfrac{W}{r_1+r_2}) Classic
One worker leaves after (t_1) hours (W = r_1 t_1 + r_2 (T-t_1)) Solve for (T)
Fractional work (e.g., 1/3 of job) (T_{\text{part}} = \dfrac{W_{\text{part}}}{R}) (W_{\text{part}} = \frac{W}{3})
Workers with different efficiencies (r_i = \frac{1}{t_i}) where (t_i) is time for worker i to finish alone Use reciprocals

3.1 Work Per Day / Per Week

If work rates are given in days or weeks, convert to a common unit (e.g., hours).

3.2 Conditional Work

  • Work left after a certain time: (W_{\text{left}} = W - R t_{\text{elapsed}}).
  • Work remaining after a fraction of the job is done: (W_{\text{remain}} = (1-f)W).

4. Edge Cases & Common Pitfalls

Edge Case Why It Matters How to Handle
Zero or negative rates Impossible physically, but may appear in poorly worded problems. Reject or set to zero after justification.
Non‑constant rates Workers may get fatigued or improve. Problem must specify; otherwise assume constant.
Simultaneous start time offset One worker may start later. Break timeline into intervals.
Partial work fractions 1/3 of the job may be ambiguous (does it mean 1/3 of the total? or 1/3 of the remaining?). Clarify via context or solve for both interpretations.
Work completed in less than one hour Requires fractional hours. Use decimal or fractional time.
Workers with identical rates Simplifies but may be mis‑read as “same person”. Treat as separate entities unless explicitly stated.

5. Rigorous Proof of the Time & Work Theorem

Let (W) be the total work, (n) workers, and worker (i) have constant rate (r_i).
Define the total work function (W(t)) as the cumulative work done from time (0) to (t).

Claim
For all (t \ge 0):

[ W(t) = t \sum_{i=1}^{n} r_i. ]

Proof (by induction on number of workers):

  • Base (n=1): (W(t) = r_1 t) by definition.

  • Induction step: Assume true for (n). Add worker (n+1) with rate (r_{n+1}).
    Total work:

    [ W_{n+1}(t) = W_n(t) + r_{n+1} t = t \sum_{i=1}^{n} r_i + t r_{n+1} = t \sum_{i=1}^{n+1} r_i. ]

Thus the formula holds for all (n).

Setting (W(t) = W) (the job is finished) gives (t = \frac{W}{\sum r_i}). ∎


6. Challenging Problem (with Solution)

Problem
A railway company has two repair teams, Team A and Team B.

  • Team A can repair a railway track segment of length (L) in 12 hours when working alone.
  • Team B can repair the same segment in 20 hours when working alone.

The two teams decide to work together on a different segment of the same length (L).

  1. They start together at 8 AM.
  2. After 3 hours, Team B pauses because the bridge they are working on collapses and they cannot continue.
  3. Team A continues alone until the segment is fully repaired.
  4. Question: In how many hours after 8 AM will the repair be completed?

Important: The teams’ work rates remain constant across segments.


Solution

  1. Compute individual rates

    • Rate of Team A: (r_A = \frac{L}{12}) units/hour.
    • Rate of Team B: (r_B = \frac{L}{20}) units/hour.
  2. Work done in first 3 hours
    [ W_{\text{first}} = (r_A + r_B) \times 3 = \left(\frac{L}{12} + \frac{L