Time & Work – SSC CPO Study Notes
(Quantitative Aptitude – Beginner Friendly)
1. What is “Work” in this topic?
- Work = a job that needs to be finished.
- Think of it as a full bucket of water that has to be filled.
2. Key ideas (no jargon)
| Idea | Everyday Analogy | Short sentence |
|---|---|---|
| Rate | How fast you fill the bucket each day | “I can fill 1/5 of the bucket in a day.” |
| Time | How many days you need to finish | “I finish the bucket in 5 days.” |
| Work Done | Portion of the job finished | “After 2 days I have filled 2/5 of the bucket.” |
3. Work = Rate × Time
Formula
Work = Rate × Time
- Rate = part of the job done per day.
- Time = number of days.
Tiny Example
- One person can finish painting a wall in 4 days.
- Rate = 1 wall / 4 days = 0.25 wall per day.
- If he works 3 days → Work done = 0.25 × 3 = 0.75 wall (75 % of the wall).
4. Finding Rate or Time
| Want to find | Use the formula | Example |
|---|---|---|
| Rate | Rate = 1 / Time | 1 wall / 4 days = 0.25 wall/day |
| Time | Time = 1 / Rate | 0.25 wall/day → 1 / 0.25 = 4 days |
5. Two or More Persons Working Together
- Each person has a rate.
- Combined rate = sum of individual rates.
- Total time = Work ÷ Combined rate.
Analogy – Two friends fill a bucket together.
- Friend A fills 1/6 bucket/day.
- Friend B fills 1/8 bucket/day.
- Together they fill 1/6 + 1/8 = 7/24 bucket/day.
- To fill 1 bucket → 1 ÷ (7/24) = 24 ÷ 7 ≈ 3.43 days.
Tiny Example
- Person A finishes in 8 days → rate = 1/8.
- Person B finishes in 12 days → rate = 1/12.
- Combined rate = 1/8 + 1/12 = 5/24.
- Time together = 1 ÷ (5/24) = 24/5 = 4.8 days.
6. When One Person Stops Working
- Work done by the first person = Rate × Time.
- Remaining work = 1 – (work done).
- Find new time needed with the second person.
Tiny Example
- A can finish a job in 10 days.
- He works 3 days → 3/10 of the job done.
- Remaining = 7/10.
- B can do it in 15 days → rate = 1/15.
- Time for B = (7/10) ÷ (1/15) = 7/10 × 15 = 10.5 days.
7. When One Person Helps Another
- They work together for a period, then one stops.
- Use the same steps as above, but add the joint work first.
Tiny Example
- A finishes job in 6 days, B in 9 days.
- They work together for 2 days → joint work = (1/6 + 1/9) × 2 = (5/18) × 2 = 5/9.
- Remaining = 4/9.
- After 2 days, A stops; B continues alone.
- Remaining time for B = (4/9) ÷ (1/9) = 4 days.
- Total time = 2 + 4 = 6 days (same as A alone).
8. Partial Work Done by One Person First
- A does a fraction of the job alone.
- B finishes the rest.
Tiny Example
- A