SSC CPO /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – SSC CPO Study Notes

(Quantitative Aptitude – Beginner Friendly)


1. What is “Work” in this topic?

  • Work = a job that needs to be finished.
  • Think of it as a full bucket of water that has to be filled.

2. Key ideas (no jargon)

Idea Everyday Analogy Short sentence
Rate How fast you fill the bucket each day “I can fill 1/5 of the bucket in a day.”
Time How many days you need to finish “I finish the bucket in 5 days.”
Work Done Portion of the job finished “After 2 days I have filled 2/5 of the bucket.”

3. Work = Rate × Time

Formula

Work = Rate × Time
  • Rate = part of the job done per day.
  • Time = number of days.

Tiny Example

  • One person can finish painting a wall in 4 days.
  • Rate = 1 wall / 4 days = 0.25 wall per day.
  • If he works 3 days → Work done = 0.25 × 3 = 0.75 wall (75 % of the wall).

4. Finding Rate or Time

Want to find Use the formula Example
Rate Rate = 1 / Time 1 wall / 4 days = 0.25 wall/day
Time Time = 1 / Rate 0.25 wall/day → 1 / 0.25 = 4 days

5. Two or More Persons Working Together

  • Each person has a rate.
  • Combined rate = sum of individual rates.
  • Total time = Work ÷ Combined rate.

Analogy – Two friends fill a bucket together.

  • Friend A fills 1/6 bucket/day.
  • Friend B fills 1/8 bucket/day.
  • Together they fill 1/6 + 1/8 = 7/24 bucket/day.
  • To fill 1 bucket → 1 ÷ (7/24) = 24 ÷ 7 ≈ 3.43 days.

Tiny Example

  • Person A finishes in 8 days → rate = 1/8.
  • Person B finishes in 12 days → rate = 1/12.
  • Combined rate = 1/8 + 1/12 = 5/24.
  • Time together = 1 ÷ (5/24) = 24/5 = 4.8 days.

6. When One Person Stops Working

  • Work done by the first person = Rate × Time.
  • Remaining work = 1 – (work done).
  • Find new time needed with the second person.

Tiny Example

  • A can finish a job in 10 days.
  • He works 3 days → 3/10 of the job done.
  • Remaining = 7/10.
  • B can do it in 15 days → rate = 1/15.
  • Time for B = (7/10) ÷ (1/15) = 7/10 × 15 = 10.5 days.

7. When One Person Helps Another

  • They work together for a period, then one stops.
  • Use the same steps as above, but add the joint work first.

Tiny Example

  • A finishes job in 6 days, B in 9 days.
  • They work together for 2 days → joint work = (1/6 + 1/9) × 2 = (5/18) × 2 = 5/9.
  • Remaining = 4/9.
  • After 2 days, A stops; B continues alone.
  • Remaining time for B = (4/9) ÷ (1/9) = 4 days.
  • Total time = 2 + 4 = 6 days (same as A alone).

8. Partial Work Done by One Person First

  • A does a fraction of the job alone.
  • B finishes the rest.

Tiny Example

  • A

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.