Time & Work – IBPS PO Quantitative Aptitude
(Study Notes – IIT‑JEE / Competitive Exam Level)
1. Core Concept
Time‑work problems ask for the time required for a task or the work done by an individual/ group when speeds are given.
- Work = amount of job (unit: work‑units)
- Rate = work done per unit time (unit: work‑units per hour)
- Time = amount of time taken (unit: hours)
[ \text{Rate} = \frac{\text{Work}}{\text{Time}} \quad\Longleftrightarrow\quad \text{Time} = \frac{\text{Work}}{\text{Rate}} ]
2. Fundamental Formulae
| Symbol | Meaning | Formula |
|---|---|---|
| (W) | Total work to be done | 1 unit (by convention) |
| (R_i) | Rate of worker (i) | (R_i) work‑units/hr |
| (T_i) | Time taken by worker (i) alone | (T_i = \frac{W}{R_i}) |
| (R_{\text{total}}) | Combined rate of (n) workers | (\displaystyle R_{\text{total}} = \sum_{i=1}^{n} R_i) |
| (T_{\text{total}}) | Time taken by all (n) workers together | (\displaystyle T_{\text{total}} = \frac{W}{R_{\text{total}}}) |
| (N) | Number of workers | (\displaystyle N = \frac{W}{R_{\text{total}}}) |
3. Derivation & Rationale
-
Single worker
[ R_i = \frac{W}{T_i};;\Longrightarrow;; T_i = \frac{W}{R_i} ] Example: If a worker can complete a job in 5 h, his rate is (R = \frac{1}{5}) work‑units/hr. -
Multiple workers working simultaneously
Each worker contributes his rate per hour.
After 1 hour, total work done: [ W_{\text{done}} = \sum_{i=1}^{n} R_i ] Hence, the combined rate is the sum of individual rates. This stems from the linearity of work. -
Time for combined work
[ T_{\text{total}} = \frac{W}{R_{\text{total}}} = \frac{1}{\sum_{i=1}^{n} R_i} ] This is the key formula; all other problems reduce to it. -
Work done after a given time
If workers work for (t) hours: [ W_{\text{done}} = t \times R_{\text{total}} ] So, if (t = \frac{W}{R_{\text{total}}}), the job is finished.
4. Common Variants & Tricks
| Variant | How to Translate | Key Insight |
|---|---|---|
| Work done by one worker in part of the time | (W_{\text{done}} = R \times t) | Use (t) as fraction of total time. |
| One worker joins after some time | Compute work done by initial group, subtract from total, then use remaining time. | Remember to convert “after” into “time spent”. |
| Workers leave before job is finished | Compute cumulative work until last worker leaves, then determine remaining work and who completes it. | Pay attention to who works when. |
| Rates given as “time to finish job” | Convert to rate: (R = \frac{1}{T}). | Avoid confusion by standardizing units. |
| Rates given in “work per man‑day” | Treat “man‑day” as 1 unit of time (24 h). | Keep consistent units. |
| “One worker takes 3 hrs more than another” | Set up equations: (T_1 = T_2 + 3). Relate to rates. | Use (T = \frac{1}{R}). |
| “One worker works half the time of another” | Express times as fractions of a reference time. | Translate to rates via inverses. |
5. Tricky Points
- Units must be consistent – Hours vs. days, per hour vs per day.
- Rate addition is linear – Even if rates are fractions, they add.
- Work done when a worker leaves – The remaining work may be zero or non-zero; always check.
- “After X hours” vs. “During X hours” – The former means the worker starts after X hours; the latter means the worker works for X hours.
- Avoid “negative work” – If a worker’s rate is negative (e.g., removing work), treat it as subtracting from total.
6. Practice Question (Hard)
Problem
Three workers, A, B, and C, can finish a job in 12 h, 10 h, and 15 h respectively if working alone.
They start together and work for 3 h. After that, worker C leaves.
Then, an additional worker D joins at the same rate as worker B.
Finally, worker A leaves when the job is 50 % completed.
Question: How many hours did worker D work?
(Answer in fractional hours, if necessary.)
Solution Outline
- Convert rates:
(R_A = \frac{1}{12}), (R_B = \frac{1}{10}), (R_C = \frac{1}{15}). - Work done in first 3 h by A+B+C:
(W_1 = 3(R_A+R_B+R_C)). - After C leaves, A+B work for some time (t_1) until A leaves when 50 % done.
Compute (t_1) from remaining work. - When A leaves, D joins B; compute how long D works (t_2) until job finishes.
- Answer is (t_2).
(Full algebraic steps omitted for brevity; students should carry them out.)
7. Quick‑Reminder Cheat Sheet
| Scenario | Formula | |