IBPS PO /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – IBPS PO  Quantitative Aptitude

(Study Notes – IIT‑JEE / Competitive Exam Level)


1. Core Concept

Time‑work problems ask for the time required for a task or the work done by an individual/ group when speeds are given.

  • Work = amount of job (unit: work‑units)
  • Rate = work done per unit time (unit: work‑units per hour)
  • Time = amount of time taken (unit: hours)

[ \text{Rate} = \frac{\text{Work}}{\text{Time}} \quad\Longleftrightarrow\quad \text{Time} = \frac{\text{Work}}{\text{Rate}} ]


2. Fundamental Formulae

Symbol Meaning Formula
(W) Total work to be done 1 unit (by convention)
(R_i) Rate of worker (i) (R_i) work‑units/hr
(T_i) Time taken by worker (i) alone (T_i = \frac{W}{R_i})
(R_{\text{total}}) Combined rate of (n) workers (\displaystyle R_{\text{total}} = \sum_{i=1}^{n} R_i)
(T_{\text{total}}) Time taken by all (n) workers together (\displaystyle T_{\text{total}} = \frac{W}{R_{\text{total}}})
(N) Number of workers (\displaystyle N = \frac{W}{R_{\text{total}}})

3. Derivation & Rationale

  1. Single worker
    [ R_i = \frac{W}{T_i};;\Longrightarrow;; T_i = \frac{W}{R_i} ] Example: If a worker can complete a job in 5 h, his rate is (R = \frac{1}{5}) work‑units/hr.

  2. Multiple workers working simultaneously
    Each worker contributes his rate per hour.
    After 1 hour, total work done: [ W_{\text{done}} = \sum_{i=1}^{n} R_i ] Hence, the combined rate is the sum of individual rates. This stems from the linearity of work.

  3. Time for combined work
    [ T_{\text{total}} = \frac{W}{R_{\text{total}}} = \frac{1}{\sum_{i=1}^{n} R_i} ] This is the key formula; all other problems reduce to it.

  4. Work done after a given time
    If workers work for (t) hours: [ W_{\text{done}} = t \times R_{\text{total}} ] So, if (t = \frac{W}{R_{\text{total}}}), the job is finished.


4. Common Variants & Tricks

Variant How to Translate Key Insight
Work done by one worker in part of the time (W_{\text{done}} = R \times t) Use (t) as fraction of total time.
One worker joins after some time Compute work done by initial group, subtract from total, then use remaining time. Remember to convert “after” into “time spent”.
Workers leave before job is finished Compute cumulative work until last worker leaves, then determine remaining work and who completes it. Pay attention to who works when.
Rates given as “time to finish job” Convert to rate: (R = \frac{1}{T}). Avoid confusion by standardizing units.
Rates given in “work per man‑day” Treat “man‑day” as 1 unit of time (24 h). Keep consistent units.
“One worker takes 3 hrs more than another” Set up equations: (T_1 = T_2 + 3). Relate to rates. Use (T = \frac{1}{R}).
“One worker works half the time of another” Express times as fractions of a reference time. Translate to rates via inverses.

5. Tricky Points

  1. Units must be consistent – Hours vs. days, per hour vs per day.
  2. Rate addition is linear – Even if rates are fractions, they add.
  3. Work done when a worker leaves – The remaining work may be zero or non-zero; always check.
  4. “After X hours” vs. “During X hours” – The former means the worker starts after X hours; the latter means the worker works for X hours.
  5. Avoid “negative work” – If a worker’s rate is negative (e.g., removing work), treat it as subtracting from total.

6. Practice Question (Hard)

Problem
Three workers, A, B, and C, can finish a job in 12 h, 10 h, and 15 h respectively if working alone.
They start together and work for 3 h. After that, worker C leaves.
Then, an additional worker D joins at the same rate as worker B.
Finally, worker A leaves when the job is 50 % completed.
Question: How many hours did worker D work?
(Answer in fractional hours, if necessary.)

Solution Outline

  1. Convert rates:
    (R_A = \frac{1}{12}), (R_B = \frac{1}{10}), (R_C = \frac{1}{15}).
  2. Work done in first 3 h by A+B+C:
    (W_1 = 3(R_A+R_B+R_C)).
  3. After C leaves, A+B work for some time (t_1) until A leaves when 50 % done.
    Compute (t_1) from remaining work.
  4. When A leaves, D joins B; compute how long D works (t_2) until job finishes.
  5. Answer is (t_2).

(Full algebraic steps omitted for brevity; students should carry them out.)


7. Quick‑Reminder Cheat Sheet

| Scenario | Formula | |

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.