IBPS PO /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Advanced University‑Level Study Notes

Subject: Quantitative Aptitude – IBPS PO
Style: MIT‑level, first‑principles, rigorous reasoning, edge‑cases, and a challenging problem.


1. Introduction

Time & Work problems ask: How long will it take a set of workers (or machines, vehicles, etc.) to complete a job?
At their core they are applications of rate (speed) and inverse‑proportional relationships between time, work and workers.

The mathematical backbone is:

  • Work (W) (units of job)
  • Rate (R) (units of work per unit time)
  • Time (T) (time taken)

The fundamental equation:

[ W = R \times T \quad\Longleftrightarrow\quad R = \frac{W}{T} \quad\Longleftrightarrow\quad T = \frac{W}{R} ]


2. Modeling Work as a Linear System

2.1. Individual Workers

Let worker (i) have a constant rate (r_i) (work units per hour).
If all workers work simultaneously for a common duration (t) hours, total work completed is

[ W = t(r_1 + r_2 + \dots + r_n) = t \sum_{i=1}^{n} r_i ]

Thus the combined rate (R_{\text{comb}}) is simply the sum of individual rates:

[ R_{\text{comb}} = \sum_{i=1}^{n} r_i ]

Assumption: Rates are constant over time; workers do not interfere or suffer diminishing returns.

2.2. Work as a Flow

Treat work as a flow through a pipe (the job). Each worker is a pump adding flow (r_i). The job is a container that fills at rate (R_{\text{comb}}). The filling time is the volume of the container divided by the flow rate.


3. Algebraic Derivation of Classic Formulas

3.1. Two Workers, Different Rates

Suppose worker A completes the job in (t_A) hours alone; worker B in (t_B) hours alone.

[ r_A = \frac{1}{t_A},\quad r_B = \frac{1}{t_B} ]

Combined rate:

[ R_{\text{comb}} = \frac{1}{t_A} + \frac{1}{t_B} ]

Time to finish together:

[ t = \frac{1}{R_{\text{comb}}} = \frac{1}{\frac{1}{t_A}+\frac{1}{t_B}} = \frac{t_A t_B}{t_A + t_B} ]

Edge case: If (t_A = t_B), then (t = \frac{t_A}{2}).
If one worker is infinitely fast ((t_B \to 0)), (t \to 0).

3.2. One Worker Leaves After (x) Hours

Worker A works alone for (x) hours, then B joins.

  • Work done by A alone: (x r_A = \frac{x}{t_A})
  • Remaining work: (1 - \frac{x}{t_A})

Let remaining time (t_{\text{rem}}) be needed with both:

[ \left(\frac{1}{t_A} + \frac{1}{t_B}\right) t_{\text{rem}} = 1 - \frac{x}{t_A} ]

Solve for (t_{\text{rem}}):

[ t_{\text{rem}} = \frac{1 - \frac{x}{t_A}}{\frac{1}{t_A} + \frac{1}{t_B}} ]

Total time: (t = x + t_{\text{rem}}).

Edge case: If (x \ge t_A), A has already finished; no B needed.

3.3. Workers with Varying Efficiency Over Time

If a worker’s rate is a function (r(t)), integration is required:

[ W = \int_{0}^{T} r(t),dt ]

The solution hinges on the specific functional form (e.g., linear decay due to fatigue). For IBPS PO, such complications rarely appear, but the principle is essential for more advanced scenarios (e.g., work with fatigue).


4. Advanced Topics

4.1. Non‑Linear Rates (Fatigue, Learning)

  • Fatigue: (r_i(t) = r_{i0} e^{-\lambda t})
    Integrate: (W_i(T) = \frac{r_{i0}}{\lambda}(1-e^{-\lambda T})).

  • Learning/Improvement: (r_i(t) = r_{i0}(1 + \alpha t)).

These models introduce exponential or quadratic relationships that can produce edge cases such as time to finish being unbounded if rates drop too quickly.

4.2. Work Partitioning & Optimization

Given a fixed total time (T), how to allocate work among workers to maximize output?

Formulate as:

[ \max \sum_{i=1}^{n} r_i t_i \quad\text{s.t.}\quad \sum_{i=1}^{n} t_i = T,\ t_i \ge 0 ]

Solution: assign all time to the worker with the highest rate (unless constraints like minimum work per worker exist).

4.3. Edge Cases

Situation Formula Interpretation Edge Case
One worker infinite speed (t \to 0) Immediate completion Not physically realistic
One worker zero speed (t \to \infty) Impossible to finish Must be excluded
Two workers identical speed (r) (t = \frac{1}{2r}) Work splits evenly Symmetry simplifies
Work done in negative time Impossible Rate assumptions violated

5. Challenging Problem (IBPS‑style)

Problem
A factory has 4 machines.

  • Machine 1 alone can complete a batch of 120 units in 10 hours.
  • Machine 2 alone can complete the same batch in 15 hours.
  • Machine 3 alone can complete the batch in 20 hours.
  • Machine 4 alone can complete the batch in 25 hours.

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.