1. Why “Time & Work” is a Mathematical Model

Symbol Meaning Units
(W) Total amount of work (tasks, units, jobs) units
(t) Time taken hours (or any time unit)
(r) Rate of a worker or machine units per hour
(P) Population of workers dimensionless

Mathematically, the relationship is

[ W = \int_{0}^{t} r(t'),dt' ]

When the rate is constant, (r(t)=r), this reduces to the simple product (W=r,t).


2. From First Principles: Constant Rates

2.1 Derivation

Assume a worker does a fixed amount (r) of work per unit time.
For a small time increment (\Delta t),

[ \Delta W = r ,\Delta t ]

Summing over (n) equal increments ((t = n\Delta t)),

[ W = r \sum_{i=1}^{n} \Delta t = r,t ]

Taking the limit (\Delta t \to 0) gives the integral form.

2.2 Basic Formulae

Situation Formula
One worker, one job (t = \dfrac{W}{r})
Two workers working together (t = \dfrac{W}{r_1 + r_2})
(k) workers, equal rates (r) (t = \dfrac{W}{k,r})
One worker works for (t_1), another for (t_2) (W = r_1t_1 + r_2t_2)

These are the “standard” textbook problems.


3. Variable Rates: Piecewise & Continuous

3.1 Piecewise Constant Rates

Suppose a worker’s rate changes after a fixed time.

Segment Duration (t_i) Rate (r_i)
1 (a) (r_1)
2 (b) (r_2)
… … …

Total work:

[ W = \sum_{i} r_i t_i ]

The time to finish a job (W) is found by solving for (t) in a piecewise linear equation.

3.2 Continuous Variable Rates

Let the rate be a continuous function (r(t)). Then

[ W = \int_{0}^{t} r(t'),dt' ]

Example: Diminishing returns – (r(t)=r_0 e^{-\lambda t})

[ W = \frac{r_0}{\lambda}\bigl(1-e^{-\lambda t}\bigr) ;;\Rightarrow;; t = -\frac{1}{\lambda}\ln!\bigl(1-\tfrac{\lambda W}{r_0}\bigr) ]


4. Multi‑Worker Systems: Linear Algebra View

When each worker (i) has a constant rate (r_i) and works for time (t_i), the total work is

[ W = \sum_{i=1}^{n} r_i t_i ]

This is a dot product of two vectors:

[ W = \mathbf{r} \cdot \mathbf{t} ]

Solving for the times (\mathbf{t}) given a work vector (\mathbf{W}) (if multiple jobs) leads to linear systems.
If workers have different capacities or constraints, we can model it as:

[ \mathbf{R},\mathbf{t} = \mathbf{W} ]

where (\mathbf{R})

Your note