SBI PO /Quantitative Aptitude

Time & work

Commercial Maths · free study notes · Updated

Time & Work – SBI PO Study Notes

(Quantitative Aptitude – Time & Work)

Why it matters
In the SBI PO exam, “Time & Work” problems test your ability to translate real‑world situations into mathematical equations and solve them efficiently. Mastery of this topic gives you a strong advantage in the quantitative section.


1. Simple Explanation

Concept What it Means Example
Rate of work Work done per unit time (e.g., workers per hour). 1 worker completes a task in 4 hrs → Rate = 1/4 task/hr
Work (W) Total amount of job to be done (usually expressed as “1 job”). Building a wall = 1 wall
Time (T) Total time to finish the job (hrs, days, etc.). 6 hrs
Work Equation (W = \text{Rate} \times \text{Time}) (1 = \frac{1}{4}\times 4)

Key Idea – If you know any two of the three quantities (W, Rate, Time), you can find the third.


2. Key Points & Formulas

Scenario Formula Notes
Single worker (T = \dfrac{W}{\text{Rate}}) Rate = 1/T if W = 1
Two workers working together (\text{Rate}_{\text{total}} = r_1 + r_2) Total time = (W / (r_1 + r_2))
n workers with different rates (T = \dfrac{W}{\sum_{i=1}^{n} r_i}) Use rates in same units
Work done in part of the job ( \text{Work done} = \text{Rate} \times \text{Time} ) Subtract from total to find remaining work
Worker stops after some time Let (t_d) be duration worker works, (t_s) be after stopping.
(W = r,t_d + r_2,t_s)
Solve for unknown time or rate
Relative speeds If worker A is k times faster than B:
(r_A = k,r_B)
Useful for “A does in 3 hrs, B in 5 hrs” type
Combining rates (\frac{1}{T_{\text{combined}}} = \frac{1}{T_1} + \frac{1}{T_2}) Works when each worker’s time to finish alone is given

Common Tricks

  1. Convert to “per hour” when times are in days or minutes.
  2. Use “work done” as the numerator and “time” as the denominator to keep fractions simple.
  3. When a worker does X% of the job in Y hours, the remaining work is ((100-X)%).
  4. Avoid cancellation errors – always keep units (hrs, days) consistent.

3. Worked Example

Problem

Three workers – A, B and C – can complete a job in 12, 15 and 20 hours respectively.
A works alone for 2 hrs and then leaves. B and C together finish the remaining work in 5 hrs.
How many hours would B alone take to finish the whole job?


Solution

  1. Rates

    • (r_A = \dfrac{1}{12}) job/hr
    • (r_B = \dfrac{1}{15}) job/hr
    • (r_C = \dfrac{1}{20}) job/hr
  2. Work done by A in 2 hrs
    [ W_{A} = r_A \times 2 = \frac{1}{12}\times 2 = \frac{1}{6}\ \text{job} ]

  3. Remaining work
    [ W_{\text{rem}} = 1 - \frac{1}{6} = \frac{5}{6}\ \text{job} ]

  4. Combined rate of B & C
    [ r_{BC} = r_B + r_C = \frac{1}{15} + \frac{1}{20} ] Find common denominator 60:
    [ r_{BC} = \frac{4}{60} + \frac{3}{60} = \frac{7}{60}\ \text{job/hr} ]

  5. Time taken by B & C together
    [ T_{BC} = \frac{W_{\text{rem}}}{r_{BC}} = \frac{\frac{5}{6}}{\frac{7}{60}} = \frac{5}{6} \times \frac{60}{7} = \frac{300}{42} = 7.\overline{14}\ \text{hours} ] But problem says they finish in 5 hrs → contradiction.
    Wait – we mis‑read the problem.
    Actually, the statement: “B and C together finish the remaining work in 5 hrs.”
    So the remaining work is (5) hrs × (r_{BC}).
    Let's compute work done by B & C in 5 hrs: [ W_{BC} = r_{BC} \times 5 = \frac{7}{60}\times5 = \frac{35}{60} = \frac{7}{12}\ \text{job} ]

  6. Check consistency
    Work done by A (1/6) + Work done by B & C (7/12)
    [ \frac{1}{6} + \frac{7}{12} = \frac{2}{12} + \frac{7}{12} = \frac{9}{12} = \frac{3}{4} ] So only 3/4 of the job is finished – something is wrong.

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.